ODIN HPHT Retrievable Bridge Plug validated for sour gas injector wells

Odin HERO V1
V0

ODIN™ HPHT Retrievable Bridge Plug validated as V0 barrier

7,500

7,500 psi. differential pressure

3

Deployment methods used: Wireline, slickline, and coiled tubing

95%

95% H₂S sour gas disposal well

Synopsis

In collaboration with an independent E&P operator managing sour gas wells, the ODIN™ HPHT Retrievable Bridge Plug underwent in-field validation to confirm its performance as a contingency barrier capable of drifting a 3.688-in. nipple profile and sealing in highly sour environment.

Deployed across two injector wells with highly deviated trajectories and Inconel completions, ODIN demonstrated reliable deployment, pressure integrity. The project validated the plug’s high range of expansion, HPHT capability, and suitability for critical barrier applications.

Challenge

Landing nipple plug contingency (sealing)

Solution

ODIN™ 4.5” HPHT Retrievable Bridge Plug

Location

Canada, North America – Onshore

Conditions

Sour gas disposal well: 95% H₂S
Max. deviation: 77°

Full case story

Solution

ODIN No Background2

ODIN™ HPHT Retrievable Bridge Plug

Medium-expansion retrievable bridge plug

Similar cases