transparent
transparent
transparent
transparent home Sitemap Green arrowContact us
Search for:   
transparent
transparent
transparent  » Services » Our Technologies » Well Miller » Case Stories » Case oct 03
transparent
transparent
transparent
transparent transparent transparent
  
  
  
  
  
  
  
  
  
transparent
transparent
transparent
transparent transparent transparent

World’s First Milling of Flapper Valve
 

October 2003

Shortly after the Well Miller was introduced, it performed its first job with great success. The operation was to mill a flapper valve of 0.78” thickness and 3.15” diameter hole on wireline by using the Well Tractor and the Well Miller. The milling operation only took 7 minutes and resulted in putting the well on production below budget.

If coiled tubing had carried out the job, the operation would have taken an estimated 4-5 days to mobilize, rig-up and run.
 

Well Data

Equipment used:                            Well Tractor and Well Miller
Accumulated Well Tractor distance:  354 ft
Maximum Well Tractor depth:           6,781 ft
Maximum deviation:                       85.6º
Maximum temperature:                  167º F

transparent
transparent
transparent
transparent

Welltec has an excellent track record of performance.

Read more about the value we have created for our clients here.

 

transparent

transparent
transparent
2008
Welltec® Has Moved into the Hungarian Market
We have performed our first jobs in Hungary for a ...