transparent
transparent
transparent
transparent home Sitemap Green arrowContact us
Search for:   
transparent
transparent
transparent  » Services » Our Technologies » Coiled Tubing Well Tractor » Case Stories
transparent
transparent
transparent
transparent transparent transparent
  
  
  
  
  
  
  
  
  
transparent
transparent
transparent
transparent transparent transparent

Zonal Isolation in U-Shaped Well
 

September 2003

In a highly deviated section in the toe of a well, a straddle packer assembly needed to be installed to isolate several intervals in order to reduce the gas to oil ratio (GOR). The straddle packer assembly was custom-designed by Welltec. To perform the operation, it was decided to run the CT Well Tractor in a tandem configuration due to high well deviation.

The operation was an unqualified success, reducing GOR from 3,000 to 1,600 Sm 3/Sm3, while boosting oil production to 1,500 Sm3/D. The increased production returned investment within 35 days. Basically, there was no alternative to the operation, as other conventional methods could not have reached the desired depth; they would have locked up 570 ft away from the target.

Furthermore, the operation eliminated the need for heavy lift requirements.
 

Well Data

Maximum Depth:      14,145 ft
Maximum Deviation: 130º

transparent
transparent
transparent
transparent

Welltec has an excellent track record of performance.

Read more about the value we have created for our clients here.

 

transparent

transparent
transparent
2008
Welltec® Performs World’s First Milling of Bridge Plugs on Wireline
Welltec is the first company in the world that has...