transparent
transparent
transparent
transparent home Sitemap Green arrowContact us
Search for:   
transparent
transparent
transparent  » Services » Our Technologies » Coiled Tubing Well Tractor » Case Stories
transparent
transparent
transparent
transparent transparent transparent
  
  
  
  
  
  
  
  
  
transparent
transparent
transparent
transparent transparent transparent

Complete Well Overhaul


September 2003

A 318 CT Well Tractor in tandem with e-line on 2” coiled tubing performed a complete well overhaul, including well clean out, PLT, plug setting and straddle pack setting. During the operation, the CT Well Tractor accumulated 7,418 ft running distance in a highly deviated well.

Utilizing the CT Well Tractor reduced the necessary size of the coiled tubing, which ultimately made the operation possible. The extra pull force provided by the CT Well Tractor made it possible to set the 312 ft long straddle pack in just 1 run.

The job could not have been carried out without the CT Well Tractor. Plug setting at a point higher in the well would have been necessary, which would have cut off parts of the pay zone. In the extreme case scenario, the well would have been shut down in order to drill a new one.

Additional benefits were environmental savings since the operation required fewer runs. Furthermore, the CT Well Tractor increased safety in job run.

 

Well Data

Equipment used: 3                 18 CT Well Tractor
Maximum Well Tractor depth:  14,436 ft
Maximum deviation:               130º
Maximum temperature:           240° F

 

transparent
transparent
transparent
transparent

Welltec has an excellent track record of performance.

Read more about the value we have created for our clients here.

 

transparent

transparent
transparent
2008
Welltec® Nominated for the ONS Innovation Award
Welltec has been nominated for the ONS Innovatio...