Well Miller Quickly Removes 689 ft of Hard Scale, October 2014

About 689 ft of CaCO3 scale bridges had decreased the ID of a wellbore from surface to the safety valve in a water producer located offshore Spain. The scale prevented the operator from cutting the tubing and a quick resolution was needed.

CONTACT

VP Marketing
Brian Sidle
bsidle@welltec.com

Always responsive to client demands, we were able to mobilize a suite of e-line equipment and crew in just four days. Another 19 hours later, the Well Miller had eliminated the problem by efficiently removing the scale down to a depth of 3,510 ft. this enabled the operator to continue with their planned operation.

The operator was very pleased with the results, pro-activeness and good crew performance of Welltec.