Case Stories Completion

Completion case stories

Read other case stories

Case Story:
Well data:
WEL TYPE: WATER INJECTOR
Case Story:
Well data:
WEL TYPE: PRODUCER
OPEN HOLE LENGTH: 16,539 ft
Case Story:
Well data:
GEOTHERMAL WELL
FIRST JOB IN GEOTHERMAL INDUSTRY IN PHILLIPINES
Case Story:
Well data:
COMPLETE ZONAL ISOLATION PROVEN FROM THE WELLTEC® ANNULAR BARRIER (WAB®) LOWER WAB® SUCCESSFULLY PREVENTING WATER PRODUCTION THROUGH A 7FT SHALE UPPER WAB® SUCCESSFULLY PREVENTING GAS PRODUCTION THROUGH A 10 FT SHALY SAND PROVEN REDUCTION IN BASIC SEDIMENT AND WATER FROM 60% TO 0.2%
Case Story:
Well data:
WELL TYPE: PRODUCTION WELL
MAX. DEPTH: 10,417 FT MD
MAX. PRESSURE: 5,400 PSI @ TD
MAX. TEMPERATURE: 175°F
WAB LENGTH: 4 FT
Case Story:
Well data:
TD: 2,950 mMD / 2,528 mTVD
MUD: 1.69 SG BRINE
WELL TYPE: OIL & GAS PRODUCER
MAX INCLINATION: 46°
MAX TEMPERATURE: 115°C
Case Story:
Well data:
N/A
Case Story:
Well data:
N/A
Case Story:
Well data:
OPEN-HOLE SIZE: 8.5"
OPEN-HOLE LENGTH: 16,298 FT
Case Story:
Well data:
N/A
Case Story:
Well data:
COMPLETE ZONAL ISOLATION
IMPROVED STIMULATION
PRODUCTIVITY ACHIEVEMENT (PLANNED 2,900 BUT AFTER SIX MONTHS OF PRODUCTION ACHIEVED AN AVERAGE OF 4,500 BBL/ DAY WITH ONLY 2% WATER-CUT)