 |
 |
 |
 |
|
 |
 |
 |
 |
 |
|
At Welltec® we Belive in Setting the Standards
|
| 2004 |
•
•
|
The Well Miller milled through scale bridge on a UK operation
The first Coiled Tubing Well Tractor operation in an open hole was
performed in Saudi
|
| 2003 |
•
•
•
|
The first operation with the Well Tractor for SAGD (Steam Assisted Gravity Drainage) was performed in Canada
The first job using the Well Tractor and LWT (Logging While Tractoring) in open hole was carried out in Saudi
The Well Miller’s first milling through a flapper valve was conducted in Norway
|
| 2001 |
•
|
In UK, the first operation with the Well Stroker and the Well Tractor was carried out successfully
|
| 1999 |
• |
In Oman, the Well Tractor conducted its first open hole operation
|
| 1996 |
• |
The very first operation with the Well Tractor was conducted in Norway
|
|
|
|
|
|
|
 |
 |
|
 |
|
|
|
|
|
|
 |
 |
|
 |
 |
 |
| |